Installation Instruction
Installation guide
Laid right,
built to last
A careful installation is what lets a tile perform for decades. Follow these steps, or share them with your installer, for a clean, level and long-lasting finish.
General guidelines
Before you beginOne batch per area
Check the batch and shade number printed on every box, and lay tiles from a single batch in each room. Shade varies naturally from batch to batch.
Blend before you fix
Lay out tiles from several boxes in the intended pattern before fixing, to confirm an even blend of shade and size.
Use 43-grade cement
Fix tiles with 43-grade OPC cement. 53-grade cement sets too fast and too hard for tile fixing.
Mix to the right ratio
For floor bedding, use 1 part cement to 4 parts sand, adjusted to site conditions. Spread only as much bed as you can tile while it is fresh.
Always leave a joint
Keep a 2–3 mm joint with spacers. Tiles butted tight together have no room to move and can lift or crack.
Tap, never strike
Settle tiles with a wooden or rubber mallet only. A metal hammer can chip or crack the surface.
Laying vitrified floor tiles
9 steps- Step 01
Check the batch
Confirm every box carries the same batch and shade number before you start.
- Step 02
Unpack the tiles
Take the tiles out of their boxes and inspect them for size, shade and any transit damage.
- Step 03
Prepare the slurry
Mix cement slurry at roughly 1.5 kg of cement per litre of water, to a smooth creamy consistency.
- Step 04
Lay the mortar bed
Spread a cement and sand bed (1 : 4, adjusted to site needs) and pour slurry over it just ahead of each tile.
- Step 05
Find the arrow
Check the arrow printed on the back of each tile. It shows the direction the tile was made to be laid.
- Step 06
Lay with spacers
Start laying with every arrow pointing the same way and a 2–3 mm spacer at each joint.
- Step 07
Level each tile
Tap each tile gently with a wooden mallet until it sits level with its neighbours and fully bedded.
- Step 08
Full tiles first
Lay all the full tiles (for example 600 × 600 mm) across the floor first, leaving cut pieces for the edges.
- Step 09
Water and let it set
Once laying is complete, sprinkle water over the floor so it seeps through the joints into the bed, then leave the tiles to set.
Fixing wall tiles
Preparation + 9 stepsPreparation
Soak the tiles
Soak wall tiles in clean water for 1–2 hours, then drain until no film of water remains on the face. Skip soaking when fixing with a tile adhesive.
Prepare the wall
Rough-plaster the wall in 1 part cement to 3 parts sand. Let the render cure for at least two weeks before tiling; never tile onto fresh plaster.
Check the cement
Use 43-grade cement. Brush a thin coat of cement slurry onto the plastered wall just before fixing.
Fixing, step by step
- Step 01
Check the batch
Make sure every box carries the same batch number.
- Step 02
Check the cement
Confirm the cement is 43-grade.
- Step 03
Soak the tiles
Soak the tiles in clean water for at least 2 hours.
- Step 04
Do not over-dry
After soaking, drain the surface water but do not let the tiles dry out fully.
- Step 05
Mix the paste
Make a cement paste with about 20% fine sand. Do not use neat cement, which can set up stress and crack tiles later.
- Step 06
Cover the back
Spread the paste over 100% of the back of the tile, with no hollow spots.
- Step 07
Fix to the level
Press the first tile onto the wall, aligned to a true level line.
- Step 08
Add a spacer
Fix the next tile with a 2 mm spacer between the two.
- Step 09
Complete the wall
Continue course by course, checking level as you go, until the wall is complete.
Grouting, finishing & cleaning
After fixingLeave room to expand
Keep a 1–2 mm gap between wall tiles and 2–3 mm on floors, so tiles can expand without lifting.
Ensure full contact
Tap each tile gently so the whole back is in contact with the mortar.
Grout after 24 hours
Fill the joints no sooner than 24 hours after fixing, once the bed has set.
Work the grout in
Press grout firmly into every joint with a rubber float, leaving no voids.
Wipe within 15 minutes
About 15 minutes after grouting, wipe off excess grout with a damp sponge, then buff the tiles with a soft dry cloth.
Clean gently
Clean with water, or a mild soap solution followed by clean water, using a soft cloth or sponge. Do not scrub or scratch, especially lustre-finish and border tiles.
Practices to avoid
During and after installation, steer clear of these common causes of hollow, lifting or stained tiles.
- Mixing tiles from different batches in the same area.
- Leaving the cement and sand bed standing too long before laying, which weakens the bond.
- Fixing wall tiles without soaking them first (unless using a tile adhesive).
- Butting tiles tightly together without a joint; they need room to move.
- Using neat cement, or 53-grade cement, to fix tiles.
- Tapping tiles with a metal hammer.
- Leaving grout residue to harden on the tile surface.
- Cleaning with hydrofluoric acid, or any acid, alkali, solvent, oil or abrasive powder.